Early March 2010
Author: vmezhvinsky | Filed under: Exterior, Interior | Tags: cabinets, California, chronicle, construction, design, design elements, development, elevator, garage, home, house, kitchen, marble, March, modern, Noe Valley, project, Project Noe, railing, real estate, renovation, San Francisco, shingled, tile |
By early March 2010, the garage door was installed, but still had to be painted black as does the trim around it. You can also see the small hedges were planted in front of the garage. As seen in the pictures, cabinets in the lower level were installed and are ready for the marble countertop to be installed. In the third picture, tile in the lower level bathroom was re-installed, because we did not like the color of the tile first selected. We decided to use this moss green tile on the walls to match better with the finishes and flooring.
The next picture shows the elevator cab finally installed and the walnut floor carried through. There is still some work left to do to the cab such as finishing the wall panels, which will occur during painting. Pictures of the living room show the railing that was installed around the main stairs and a makeshift rack used to store all the remaining baseboards and trim waiting to be installed in the home. Read more »