Late April 2010

Author: vmezhvinsky | Filed under: Exterior, Interior | Tags: , , , , , , , , , , , , , , , , , , , , , , , , , |

By the end of April 2010, the Project Noe house is only a few weeks away from completion. The front door is now installed and is ready for some paint. The garage door and surrounding trim are also ready to be painted black. The glass showers and glass in the railings are some of the next items to be installed. The large sliding barn door was installed and is a nice functional touch for the media room.

The limestone fireplace in the living room is an elegant focal point for the room. The backsplashes in the kitchen are made of the same Walker Zanger Helsinki Winter Mist marble as seen in the powder room bathroom. The Uline wine fridge in the kitchen and Sub Zero wine fridge in the downstairs bar area have also been installed. Read more »

Share:
  • Print
  • email
  • Facebook
  • Twitter
  • Google Bookmarks
  • Digg
  • del.icio.us
  • StumbleUpon
  • LinkedIn
  • Sphinn
  • Mixx
  • Technorati