Mid September 2009
The following pictures show the house with the windows installed. The next step on the exterior is to wrap the house and install cedar shingles. The lower floor radiant heating manifolds were installed….
Mid July 2009
Here we are nearing completion of structural framing, getting ready for window installation. At this point the rooms are beginning to take shape and the house is almost ready for rough plumbing and…
Framing June 2009
The picture above shows the upper staircase that leads up from the main level to the bedrooms. From the first picture below you can see the media…
Framing May 2009
The following pictures show the project about halfway through framing. A majority of the wooden joists are in at this point and the house is already starting to take shape. From the rear…