By the end of April 2010, the Project Noe house is only a few weeks away from completion. The front door is now installed and is ready for some paint. The garage door and surrounding trim are also ready to be painted black. The glass showers and glass in the railings are some of the next items to be installed. The large sliding barn door was installed and is a nice functional touch for the media room.
The limestone fireplace in the living room is an elegant focal point for the room. The backsplashes in the kitchen are made of the same Walker Zanger Helsinki Winter Mist marble as seen in the powder room bathroom. The Uline wine fridge in the kitchen and Sub Zero wine fridge in the downstairs bar area have also been installed. As you can see from the pictures, the Thermador fridge is almost installed, and the 48-inch Wolf gas range looks great against the white painted cabinets. The recessed lighting and the contemporary ceiling lights in the dining room, breakfast nook and the bedrooms were also installed. In the bathrooms, Toto toilets were installed along with sinks and vanities. Since there are only a few remaining items left to complete at this point, these will be the last pictures of the work in progress. Stay tuned for pictures of the completed home. Thank you all for following along as we complete our first project!
Related posts: Early March 2010, Mid January 2010, Mid February 2010, Mid March 2010, Project Noe Completed,