home      store       food & drink       misc.       project noe  

Framing June 2009

Posted: October 30th, 2009 | Author: vmezhvinsky | Filed under: Framing | Tags: , , , , , , , , , , , , , | No Comments »

mainfloor-june15thThe picture on the right shows the upper staircase that leads up from the main level to the bedrooms. From the first picture below you can see the media room starting to take shape. Some of the pictures show the original portion of the house, which the city required to be integrated with the new structure. New wood was added to provide additional support for the existing wood framing. The final picture in the series shows what will be the exterior wall with french doors that will open onto the master deck. The deck will measure 22 feet wide by 15 feet long.

Share:
  • Print
  • email
  • Facebook
  • Twitter
  • Google Bookmarks
  • Digg
  • del.icio.us
  • StumbleUpon
  • LinkedIn
  • Sphinn
  • Mixx
  • Technorati

Related posts: Framing May 2009, Foundation May ’09 Cont., More Foundation, Foundation May ’09, Foundation April ’09,



Leave a Reply